Tag Archives: Bid results

Perspective on percentages

Estimating involves a lot of details and mathematics which must often be communicated with great speed and precision.  Unfortunately, there are terms that are so frequently misused that the information being shared is of little value.  A percentage is a simple concept with great utility and flexibility depending on your perspective.

Sometimes 10% to one party isn’t 10% to the other

Subcontractors regularly call to request bid results of the General Contractor (GC) estimator to define how closely their bids are following market prices.  Estimating often requires discretion during the bid (before the deadline) in order to maintain a fair competition for the subs, and to protect the firms interests.  All too often, the focus on discretion leads GC estimators to be incredibly reluctant to provide their bidding subs transparency in bid results.  The best bid results many GC estimators will offer is a percentage presented in vague terms.  “You were 10% higher than the low bid” is a typical example.

For simplicity’s sake, let’s assume that the inquiring subcontractors bid was $100,000.  Ten percent of $100,000 is $10,000.  So we might think the low bid amount was $90,000 so far, so good. But it’s wrong!

Perspective on percentages

“Yep, that’s the look of someone who’s made a rookie mistake.”

If the low bid actually was $90,000, adding 10% would make the 2nd low bidder $99,000 not $100,000 because 10% of $90,000 is $9,000.

In order to figure out the low bid amount, using only the information provided we can lay out what we know in an equation.

The percentage given represents the difference between the low bid, and the calling subs number in proportion to the low bid amount.

Putting this into an equation gives us:

($100,000-$Low bid)/($Low bid) = 10%

Solving for low bid we have:

($100,000)/( 10%+1) = $Low Bid

$100,000/1.1 = $90,909.09

Deducting the calling subs bid from the low bid give us the dollar amount they lost by.

$100,000 – $90,909.09 = $9,090.91

This means the calling subs was $9,090.91 higher than the low bid.

Rounding to an even $9,000, it’s plain to see that the calling sub would have needed to cut 9% from their $100,000 proposal to match the low bid amount.  Since the entire point of bid results is to define what you’d need to improve, it’s imperative to correctly interpret what you’re being told.  The GC’s is telling the sub they are 10% higher than the low bidder, when the Sub actually needed to cut 9% to match the low bid amount.

That simplified example might lead you to think 1% is no big deal, and on smaller projects, that might be true.  Have a look at what happens when we run through that example again with a 30% difference.

($100,000)/(30%+1) = $Low bid

($100,000)/(1.3) = $76,923.08

$100,000 – $76,923.08 = $23,076

Round that to $23,000 and the sub only needs to cut 23% from their bid to make up a 30% difference at the GC’s desk.  A 7% difference in perspective can lead to completely wrong conclusions.

Just to sum up, the GC is calculating the bid-result difference as follows:

($Sub bid – $Low bid) / ($Low bid)= % Higher than low bid

The sub is calculating the percent they must cut their amount to meet the low bid as follows:

($Sub bid) / (1+ % Higher than low bid) = % to match low bid

Many GC estimators prefer to give bid results in percentages because this minor obfuscation  spares them from actually speaking dollar amounts aloud where they might be overheard and misconstrued as bid shopping.  Bid shopping is when a GC informs a colluding subcontractor of their competitors price for the purpose of soliciting a lower bid.  In some cases bid shopping is illegal, and in all cases it’s unethical.

Subs calling for bid results should be prepared to think on their feet to rapidly calculate the hard numbers behind the percentages.  Responding to the percentage provided with “So the low bidder was $XYZ amount?” gives subs a chance to confirm what they’re being told, without obliging the GC estimator to speak the number aloud.

514007541_1bd174d191_z

Photo by Andrew Dobrow

Contractor cloaking technology isn’t very sophisticated

Subs should be especially conscientious about clarifying the bid results they receive from  Project Managers (PMs).  PM’s traditionally “buy out” the estimate which means they’re checking their estimators work, and addressing the problems they find.  They might have discovered that the  bid-day low sub was missing some costly scope inclusion, which made a different bidder the legitimate low-bid.  This vital error-checking process naturally requires  discretion to avoid the appearance of impropriety.  PM’s providing bid results after all that review may be looking at a considerably different situation than their estimator presented.  Honest PM’s will do their best to work out the errors in the order of bid-day performance.  If the corrective addition to the low bid makes the new total higher than the 2nd low bidder, the PM will hire the 2nd low bidder (provided their scope is complete).

I should mention that it’s a curious coincidence that many of the most dishonest PM’s I’ve encountered have a habit of saying every bid was “close” or “within 2%”.  Estimators should be particularly wary of clients showing any signs of dishonesty.  The false pretense of a  hotly contested bid is a potential warning sign of bid-shopping, especially when similar projects deliver a larger spread between bidders.

Where percentages work, and where they really don’t!

There are several components of an estimate that operate on percentages.  Profits, taxes, fees, and bonds are frequently calculated as percentages of the total costs.  There are some estimators who believe that overhead should be calculated as a percentage of project cost despite the many ways this goes wrong.  Unfortunately, this archaic thinking is sometimes bound into contractual terms where change orders are limited to predefined percentages for overhead and profit.

Overhead is the cost of doing business over time, which is not directly driven by the project cost.  Imagine a one month duration project that has a slightly cheaper level of finishes, resulting in a lower total project cost.  Did that decline in finish alter the rent at your office? No, your rent is the same regardless of what your client’s project costs, so why jeopardize the means to cover your overhead by pricing it as a percentage?   This practice virtually guarantees that projects above a certain value will be overpriced, while projects under that value will be under-priced.  In extreme cases, you’ll never win big jobs, and you’ll go broke doing little ones.

The difference between markup and margin

All business is a balance of risk versus reward; estimators calculate that potential reward in terms of profit.  It’s here that we encounter some terms that are often misunderstood, and misapplied.  Let’s say we’ve got a project worth $100,000 after all the costs are included.  Now for that $100,000 worth of work (risk), we’d like to see 25% profit (reward).  This percentage is known as markup.

$Subtotal X Markup % = $Profit

$100,000 X 25% =  $25,000

We add that profit to our subtotal and our bid amount is $125,000.

Now let’s say we won ten such jobs in one year.

10 x $125,000 = $1,250,000

That means the company had a total revenue of $1.25 Million.  So the boss is reviewing the books at the end of the year which will show all the costs, and all the earnings.  The difference between all the costs and all the earnings is your total profit.

We know that every estimate had $25,000 for profit, there were ten jobs, and to keep things simple, we say everything went perfectly according to plan on all of them.  This means the total profit should be $25,000 X 10 = $250,000.

Let’s take that $250,000 total profit and divide it by the $1,250,000 total revenue to determine the percentage of profit we’re actually earning.

($250,000) / ($1,250,000) = 20%

The percentage of profit we’re actually earning on our revenue is known as the Margin. As we can see, a 25% markup yielded a 20% margin.  This is where estimators need to consider what’s going on from an owner’s perspective.  The overall risk versus reward to the firm is the total revenue versus the total profit.  They’re not working off the subtotals of every estimate, they’re working off the contracted total amounts.  Margin makes sense when you’re working off of revenue amounts, because it directly speaks to the profitability of your entire operation.

Imagine how serious it would be for someone who misunderstood markup to be margin.  The 5% difference between 25% and 20% may not seem like much until you consider that profit to be their annual income.  That would be like working five days a week and only getting paid for four!  Many entrepreneurs  have failed because they didn’t understand this concept until it was too late.

Photo by strange_r

Photo by strange_r

Jim knew things weren’t adding up, but he couldn’t figure out why.

Just like the bid-results example above, the differences grow with the percentages in question.  A 25% Markup results in a 20% margin, whereas a 33% markup results in a 25% margin.  The percentage of markup is always higher than the margin percentage.

Putting this into formulas we get:

% Margin = (% Markup)/(1 + %Markup)

% Markup = (%Margin) / (1- %Margin)

We can calculate the total with a specific margin by using this formula:

$Total = ($Subtotal) / (1- %Margin)

So why do people get this wrong all the time?

The construction industry is very competitive which means that contractors must bid with lower profit percentages in order to win work.  It’s quite common for hard-bidding GC’s in tight markets to bid with less than 5% markup.  The difference between markup and margin is quite small when the percentages in question are in the single digits.  If the project isn’t worth very much to begin with, these differences become even less significant.  Sadly, many firms have leadership that developed bad habits when they were small and just starting out, that are ruinous to the larger operation they oversee in the present.

Fiddling with your fee

Sometimes markup is known as a fee which can get confusing when we are dealing with cost-plus contracts.  Cost plus contracts are invoiced on a “time and material” basis with either a fixed fee (set dollar amount), or a fixed percentage.

In the case of a percentage based fee, it’s absolutely critical to understand whether the fee is actually a markup, or a margin.  Contracts stipulating that the contractors fee may be no more than XYZ% of the total invoiced amount, are allowing the fee to be calculated as a margin.

Conversely, contracts stipulating that the contractors fee may be no more than XYZ% of the total time and material costs, are requiring the fee to be calculated as a markup.

This same logic applies to contractually stipulated overhead and profit percentages on change orders.  It’s been my experience that if the client took the trouble to stipulate overhead and profit percentages, they’ll likely limit those percentages to markup only.

I hope this article has helped to shed a little light on how percentages change with perspective.

 

For more articles like this click here

© Anton Takken 2016 all rights reserved

 

 


Statistics are the estimator’s shorthand

It’s pretty obvious that estimating is a profession that requires a lot of math.  If you look beyond calculations of  all that’s obvious, you’re left with quantifying the unclear, and the uncertain.  Construction can be a complicated business.  Describing the impact that one detail may have to an overall assembly can be very difficult.  In the field, we have industry jargon to abbreviate lengthy terms relating to the task at hand.  In many ways estimators use statistics as a shorthand to express the complex relationships they’re dealing with.  In really simple terms, we’re trying to express two simple concepts about a group of numbers.  First, we want to know what’s the “center” of the group.  Second, we want to know the “spread” of the group of numbers. We’re looking for a “central tendency” which gives us some assurance that our short-hand answer is representative of the original data.  An outlier is a number that’s inconsistent with the rest of the group.

Statistics are the estimator's shorthand

In some cases the outlier is as threatening as the group…

Average

Average or mean, is the most common and familiar statistical shorthand to describe the center a set of numbers.  The math is pretty simple, it’s the sum of every number in the set, divided by the count of numbers in the set.  When the numbers in the set are similar, the calculated average is close to any individual number in the set.  That’s a long way of saying that averages are only meaningful when the numbers in the set are similar.

As estimators, the utility of an average is that you can take the complexities of larger systems and “boil it down” to a handy number.  We most often see these applied in unit or parametric pricing.  An “average” restroom may cost $X amount based on the average of what restrooms have cost in the past.

It’s “mean” for a reason

Averages that are based on sets of numbers with wildly different values can generate misleading information.  Picking up on the restroom example, imagine what might happen to your average if your past projects included ten truck stops, a campground, and a queens powder room!  Outliers can skew your statistics to an incredible degree.

Statistics are the estimator's shorthand

Bending the curve can lead to errors in judgment…

Median

Median is another way to describe the center of a set of numbers.  The median is the middle number of the set when the numbers are arranged from smallest to largest.  If there is an even count of numbers in the set, you calculate the average of the middle two.  This is a statistic that’s under-utilized  because it’s benefit isn’t immediately obvious.  The entire point of a statistic is to create a shorthand, one-number answer to inform what a bunch of numbers are telling us.  If we limit our examples to simple and similar number sets, there really isn’t much difference between an average and a median.  However, when our number set includes outliers, as in the Queens powder room, the median more accurately illustrates the central tendency of the data set.  That’s a fancy way of saying that the median helps to knock out the outliers in your data.

Students of estimating should notice something here.  If the data is really consistent, you probably didn’t need to calculate the average because it’s obvious.  If the data has clear outliers, the median’s easier to spot and it’s more useful anyway.

Range

Range speaks to the “spread” of a group of numbers.  Range is the difference of the largest and the smallest numbers in the set.  Simply subtracting the largest from the smallest number will give you your range.  Estimating can be likened to a series of approximations.  We must confine our approximations by defining the smallest and the largest acceptable answers.  Each successive approximation reduces the range of acceptable answers.  Broadly speaking, estimators can add up everything that’s obvious to arrive at the smallest acceptable answer, however we know that the risk of the unknown has value.  Estimators often express these concepts in terms of “best case or worst case” scenarios.  The range defines the potential risk between the two.  It’s entirely possible for the potential risk to exceed the anticipated reward of a project.

Statistics are the estimator's shorthand

It’s easy to dig yourself into a hole, but it’s a bear getting out.

Range is also used to define the difference between subcontractor (sub) proposals or bid results.  A small range may indicate a consensus view among bidders, whereas a larger range may indicate the opposite.

Standard Deviation

If every group of numbers has a mean, than every other number in the group has a deviation (difference) from the mean.  Value – Mean = Deviation.  Standard Deviation is an estimate of the size of a typical deviation.  There are four steps to calculating standard deviation

  1. Calculate the mean
  2. Calculate the deviation for each number in the set and square the result
  3. Calculate the mean of the squared deviations
  4. Calculate the square root of the result

The standard deviation informs you of how widely the set of numbers differs from the mean of the set.  A small standard deviation indicates that the spread is minimal which implies the mean is more representative of the set.

Standard deviation becomes particularly useful to identify whether the numbers in a set are clustering around the mean.  A set with one outlier will have a lower standard deviation than a set with several outliers even if both sets have the same calculated range and median.

Mode

Mode is the most frequently occurring variable in a data-set.  We really don’t hear people using the term “mode” to refer to estimating, but it’s being used nevertheless.  The important thing to understand about mode is that it’s useful outside of numbers.  Tracking our work as estimators may be evaluated in many different ways.  If you wanted to know which month is the least productive, or which city had the most projects, you’re asking about the mode of your work.

An absolutely astounding amount of information is created during a bid, however many estimators fail to record job characteristics beyond the construction documents.  Tracking project parameters like cities, dates, values, construction types, and even required working hours can generate informative feedback about your market.  Tracking which competitor won the jobs you lost may reveal trends that speak to your chances on a new opportunity.

If there was one area of statistics that estimators could improve upon, it would be mode.  I think estimate tracking is neglected when markets are good because it’s relatively easy to win work.  Lacking sufficient pressure to improve, most companies simply aim to repeat whatever worked on the last thing they bid.  When markets shift, these firms often resort to chasing every lead in hopes of landing a fruitful job with leads into future work.  Running blind leads to crashing hard.   Estimate tracking can be a thankless business, but it can be a profound help to cull the good leads from the bad.  Time spent on fruitless bidding begets more fruitless bidding.  Sober heads must prevail if anything is to improve.

Statistics are the estimator's shorthand

Good judgment will make you stand out from the crowd

 Trade-offs

Working with statistics involves trade-offs that must be considered.  For example, let’s say you’re bidding a chain restaurant that’s similar to several past bids.  You could calculate the average square foot cost of your past bids to arrive at a total for the current project.  Now, for argument’s sake, let’s suggest that you didn’t win all of those past bids.  If you’re strictly working off your past bids, there’s a built-in rate hike.

Even if you only factored the winning bids, do you know which ones went on to be profitable?  Many estimators hand off their bids to Project Managers  (PM) for the construction phase.  Some PM’s don’t track their change orders separately from the original bid which can make big differences in profitability, and production.  Estimators must understand that winning an unprofitable job is much worse for their company than losing a bid.  Since you can’t count on change orders to save you, every bid should include sufficient overhead and profit to make the work worthwhile.

Finally, there may be features that factor into a project cost in ways that don’t translate to square foot costing.  Rest rooms are a good example of this because they require many trades and vendors to assemble compared to any other room.  An individual restroom is a costly parameter that is not exclusively driven by the building’s square footage.  It’s entirely possible that two otherwise identical projects would have different numbers of restrooms.  They certainly won’t cost the same amount as a result.

All of these considerations go towards questioning the value of the data, before trusting the statistics on the data.  Bad information will give you bad statistics every time.

Factoring

So far, I’ve focused on basic statistical analysis.  As estimators we might be comparing samples that we know are imperfect for the task at hand, simply because it’s all we have to go on.  For example, let’s say you’re trying to get a sense of what it will cost to build out a “white box” space into a bank.  If your past experience included ground-up banks and the occasional retail Tenant Improvement (TI), you have some obvious similarities to work with.

Starting with the ground-up bank bids, you need to consider what portion of the total cost was for the “core and shell”.  The goal here is to strip out the parts that don’t apply to your current project.  The amount we’re left with is a proportion of the original total.  That proportion is known as a “factor”.  We can take that factor and multiply it with another ground-up bank bid to arrive at the approximate value of the TI portion.  You might hear someone say that they factored out the core and shell portion of their ground-up bids.

The idea here is to cut out anything you don’t need and add where you do.  You might hear these operations referred to as “corrections, “adjustments” , or “compensations for xyz”.  Estimators should interpret these terms to mean there’s built-in uncertainty in the affected information.

The weighted average

A retail TI may have a lot in common with a bank build out.  For example the level of finishes and square footages may be very similar.  The differences between a retail TI and a bank TI may be tougher than line-item considerations will allow.  Obviously a store selling lawn equipment will have less in common with a bank than a high-end clothier.  What we’re looking for is a means to minimize the differences and maximize the similarities.  We can achieve this aim by a process known as a weighted average.  The weighted average is an average resulting from the multiplication of each component by a factor reflecting its importance.

Weighted averages can be factored in several different ways.  One approach is to use positive factors that are greater than or equal to 1.  Applying this to our example, we might apply a factor of 3 to the adjusted bank estimates, a factor of 2 to the high-end clothier TI, and a factor of 1 to the lawn equipment store TI.  Assuming we had four banks we have the following:

Banks                          4 each x 3 factor = 12 weight

High end clothier        1 each x factor 2 = 2 weight

Lawn equip                 1 each 2 factor 2 = 1 weight

Total weight  =15

We then calculate the weighted average by factoring for each component

Bank #1           250,000 X  3   = 750,000

Bank #2           244,000 X  3   = 732,000

Bank #3           230,000 X  3   = 690,000

Bank #4           226,000 X  3   = 678,000

Clothier           225,000 X 2    = 550,000

Lawn                190,000 X 1    = 190,000

Total   = 3,590,000

Now we divide by our total weight of 12 to get our weighted average

3,590,000 / 12 = 299,166

The non-weighted average of this example comes to 277,500 which illustrates the difference weighting can make.

A word of caution is in order here.  Factoring and weighted averages can generate flawed information if they’re not used with care.  Earlier I used an example of factoring out the core and shell costs on ground-up banks.  There’s a built-in assumption that the going rate for ground-up work is the same as TI work.  In reality, the TI work may be more expensive because there’s less competition for smaller jobs, or because the site logistics are more difficult when you’re surrounded by finished spaces.  Lacking first-hand experience, it’s difficult to factor for uncertainty.   On the other hand, it’s easy to steer your way to a favorable answer.  I see a lot of this kind of thinking employed to rationalize a mistake.

Statistics are the estimator's shorthand

Edna tries to make her driving position look reasonable with a little help from her husbands wardrobe

Accuracy versus precision

Estimators have to deal with uncertainty, it’s part of everything we do.  We often think of that uncertainty outside of our “answer” to what something costs.  In fact, the only time we’re actually certain, is when the project’s done, the bills are paid, and the final reckoning is complete.  There’s a great temptation to assume that our past work is fact so that we’re basing our current decisions on something scientific.

Truthfully, the only accurate price, is the winning bid on bid day.  It doesn’t matter if you used a supercomputer or a dart board to arrive at a losing number because the outcome is the same.  Accuracy is more important than precision.

Accuracy and precision are not interchangeable terms.  Accuracy is an approximation of how close a measurement system is to the subjects actual value.  Precision is an approximation of a measurement systems repeatability.

This distinction is important because it’s easy to get hung up on precision when there opportunities to apply mathematical processes.   Being able to repeatedly output the same answer is great for consistency, however we win jobs by hitting the market price.

If you’re 10% higher than the low bidder every time you bid, you know that your precision is nearly 100%, but your accuracy is only 90%.  Unless you find a way to profitably cut 10% on the next bid, you’ve got little reason to expect a win.

Estimators need both precision and accuracy.  Guessing may land you the occasional victory, but it’s a gamble whether the amount bid will lead to profitable work without the precision of repeatable estimating  process.

Clusters, stratification, and outliers

Estimators who receive several bids on the same scope of work will be able to recognize some patterns.  Arranged in ascending order of value, some bids may tightly cluster around a value.  Provided there are enough bids from a diverse group of bidders, you might see several clusters appearing.  This stratification can provide some delineation between groups of bidders that is instructive.  Finally, you might see proposals that are substantially different from any clusters or strata.  Outliers are worrisome because they may imply a bidder mistake .

Every company has an efficiency of scale which tends to make them a market leader when they’re competitively bidding work that fits their key efficiencies.  When several companies have similar efficiencies of scale, their bids tend to cluster very closely.  With a large enough sample, it’s possible to see bidders stratifying according to their efficiencies of scale.  Estimators should be cautious, because stratification can be driven by differences in scope interpretation as well.

Competitive bidding means we’re constantly looking for the lowest bidder, which may be an outlier of the group.  It’s obvious that omitting, excluding, or misunderstanding the project scope can lead to underestimating the cost of the work.  Estimators calculate the risk of hiring a low bidder by subtracting the 2nd low from the low bid amount.  This is the cost for the GC to “buy” their way to the 2nd low bidder if the low bidder proved unacceptable.

Perception driven perfection

Lots of GC’s have a policy of requiring at least three sub bids per trade as sufficient proof to draw meaningful estimating conclusions.  Indeed, if the three market-leading subs of every trade are consulted, the GC may rest assured that they’ll win more than their competitors.

However, some GC’s solicit the exact same subs for all their bids regardless of what they pursue.  This limited perspective creates very little useful information.  Sadly, this practice generates very consistent statistics as losses stack up. Great precision, with little accuracy.

GC’s who challenge their perceptions by monitoring what goes on within their local markets may learn what stratifies bidders and predicts market leaders.  Be honest with yourself, and admit faults where they exist.  Many estimators could improve their hit rates tremendously by targeting only those opportunities they can actually win with the resources they currently possesses.  GC’s who aren’t attracting top subs should take every opportunity to improve their reputation.  It should be obvious that subs can see when a GC is constantly losing bids.   They can also see which GC is steadily winning bids.  Estimates are not free so the best sub prices go to the GC’s who won’t squander them.  This is why bidding less often leads to winning more.

 

For more articles like this click here